Project record
N.S.Road to Kuntaramenahalli via Chikkayadaganahalli
PMGSY-I · package KN2502 · Gubbi block · Maintenance
- Location
- Gubbi block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 9 of 9
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
N.S.Road to Kuntaramenahalli via Chikkayadaganahalli
OMMAS lists PMGSY-I work KN2502 as “N.S.Road to Kuntaramenahalli via Chikkayadaganahalli”.
Road Name / Bridge Name: N.S.Road to Kuntaramenahalli via Chikkayadaganahalli
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 3
Project / work ID
KN2502
OMMAS package number KN2502.
Package No.: KN2502
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 3
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 3
Contractor
Lakshminarayana Reddy
OMMAS lists the contractor for this work as “Lakshminarayana Reddy”.
Contractor Name: Lakshminarayana Reddy [28 Aug 2001]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 3
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹24.44 lakh
The sanction cost is recorded as 24.44 (₹ lakh).
Sanction Cost: 24.44
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 3
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-07-2003
The completion date column reads “Financial: 30-07-2005/ Physical: 31-07-2003”; the physical completion date is 31-07-2003.
Completion Date: Financial: 30-07-2005/ Physical: 31-07-2003
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 3
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[10]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
3.500 km
Road length 3.500 km; 3.500 km recorded as completed.
Road Length (Kms): 3.500
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 3
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 3