Project record
Gubbi -N.S.Pura road to Herur-Belavatha road
PMGSY-I · package KN2504 · Gubbi block · Completed
- Location
- Gubbi block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 9 of 9
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Gubbi -N.S.Pura road to Herur-Belavatha road
OMMAS lists PMGSY-I work KN2504 as “Gubbi -N.S.Pura road to Herur-Belavatha road”.
Road Name / Bridge Name: Gubbi -N.S.Pura road to Herur-Belavatha road
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 4
Project / work ID
KN2504
OMMAS package number KN2504.
Package No.: KN2504
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 4
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 4
Contractor
Guru and Co Tumkur
OMMAS lists the contractor for this work as “Guru and Co Tumkur”.
Contractor Name: Guru and Co Tumkur [21 Dec 2002]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 4
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹52.99 lakh
The sanction cost is recorded as 52.99 (₹ lakh).
Sanction Cost: 52.99
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 4
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-04-2004
The completion date column reads “Financial: 09-12-2005/ Physical: 30-04-2004”; the physical completion date is 30-04-2004.
Completion Date: Financial: 09-12-2005/ Physical: 30-04-2004
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 4
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[10]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
6.300 km
Road length 6.300 km; 6.300 km recorded as completed.
Road Length (Kms): 6.300
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 4
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 4