Project record
Honnudike Cross to Neralapura
PMGSY-I · package KN2504 · Tumkur block · Completed
- Location
- Tumkur block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 9 of 9
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Honnudike Cross to Neralapura
OMMAS lists PMGSY-I work KN2504 as “Honnudike Cross to Neralapura”.
Road Name / Bridge Name: Honnudike Cross to Neralapura
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 24
Project / work ID
KN2504
OMMAS package number KN2504.
Package No.: KN2504
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 24
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 24
Contractor
Guru and Co Tumkur
OMMAS lists the contractor for this work as “Guru and Co Tumkur”.
Contractor Name: Guru and Co Tumkur [21 Dec 2002]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 24
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹49.75 lakh
The sanction cost is recorded as 49.75 (₹ lakh).
Sanction Cost: 49.75
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 24
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-05-2003
The completion date column reads “Financial: 22-12-2005/ Physical: 31-05-2003”; the physical completion date is 31-05-2003.
Completion Date: Financial: 22-12-2005/ Physical: 31-05-2003
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 24
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[10]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
6.000 km
Road length 6.000 km; 6.000 km recorded as completed.
Road Length (Kms): 6.000
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 24
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 24