Project record
N.H-4 to Lakskmisagara Gate
PMGSY-I · package KN2506 · Sira block · Completed
- Location
- Sira block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 9 of 9
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
N.H-4 to Lakskmisagara Gate
OMMAS lists PMGSY-I work KN2506 as “N.H-4 to Lakskmisagara Gate”.
Road Name / Bridge Name: N.H-4 to Lakskmisagara Gate
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 18
Project / work ID
KN2506
OMMAS package number KN2506.
Package No.: KN2506
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 18
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 18
Contractor
Shivananda
OMMAS lists the contractor for this work as “Shivananda”.
Contractor Name: Shivananda [18 Oct 2002]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 18
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹39.12 lakh
The sanction cost is recorded as 39.12 (₹ lakh).
Sanction Cost: 39.12
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 18
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-12-2003
The completion date column reads “Financial: 31-03-2005/ Physical: 31-12-2003”; the physical completion date is 31-12-2003.
Completion Date: Financial: 31-03-2005/ Physical: 31-12-2003
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 18
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[10]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
5.150 km
Road length 5.150 km; 5.150 km recorded as completed.
Road Length (Kms): 5.150
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 18
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 18