Project record
Magadi Border to Niduvalalu Via Thondagere
PMGSY-I · package KN2510 · Tumkur block · Completed
- Location
- Tumkur block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Magadi Border to Niduvalalu Via Thondagere
OMMAS lists PMGSY-I work KN2510 as “Magadi Border to Niduvalalu Via Thondagere”.
Road Name / Bridge Name: Magadi Border to Niduvalalu Via Thondagere
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 24
Project / work ID
KN2510
OMMAS package number KN2510.
Package No.: KN2510
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 24
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 24
Contractor
Guru and Co Tumkur [06 Sep 2004], Guru and Co Tumkur
OMMAS lists the contractor for this work as “Guru and Co Tumkur [06 Sep 2004], Guru and Co Tumkur”.
Contractor Name: Guru and Co Tumkur [06 Sep 2004], Guru and Co Tumkur [21 May 2011]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 24
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹33.80 lakh
The sanction cost is recorded as 33.80 (₹ lakh).
Sanction Cost: 33.80
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 24
Maintenance cost due
₹2.04 lakh
The “5 Years Maintenance Cost Due” column shows 2.04 (₹ lakh).
5 Years Maintenance Cost Due: 2.04
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 24
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-12-2007
The completion date column reads “Financial: 09-05-2012/ Physical: 31-12-2007”; the physical completion date is 31-12-2007.
Completion Date: Financial: 09-05-2012/ Physical: 31-12-2007
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 24
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
2.700 km
Road length 2.700 km; 2.700 km recorded as completed.
Road Length (Kms): 2.700
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 24
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 24