Skip to content
CivicProof

Project record

MRL1-Huvinakatte to SH 84 Via Talekoppa,Maranahally

PMGSY-II · package KN25101 · Gubbi block · Maintenance

Location
Gubbi block, Tumakuru district
Alignment drawn
none published: found by name
Documents
2
Verified facts
10 of 10
10 verified in official records0 open questions

Who is responsible

The project, the agency that executes it, and the contractor named in the records.

Project

MRL1-Huvinakatte to SH 84 Via Talekoppa,Maranahally

OMMAS lists PMGSY-II work KN25101 as “MRL1-Huvinakatte to SH 84 Via Talekoppa,Maranahally”.

Road Name / Bridge Name: MRL1-Huvinakatte to SH 84 Via Talekoppa,Maranahally

[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 1

VerifiedOfficial record

Project / work ID

KN25101

OMMAS package number KN25101.

VerifiedOfficial record

Responsible agency

DPIU Of Tumkur

The programme implementation unit is recorded as “DPIU Of Tumkur”.

Programme Implementation Unit: DPIU Of Tumkur

[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 1

VerifiedOfficial record

Contractor

N G RAMALINGE GOWDA [04 Mar 2014], Druva eletricals [04 Mar 2014], Druva eletricals

OMMAS lists the contractor for this work as “N G RAMALINGE GOWDA [04 Mar 2014], Druva eletricals [04 Mar 2014], Druva eletricals”.

Contractor Name: N G RAMALINGE GOWDA [04 Mar 2014], Druva eletricals [04 Mar 2014], Druva eletricals [04 Mar 2014]

[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 1

VerifiedOfficial record

Money

Amounts as stated in the records, with their units.

Sanctioned cost

₹440.51 lakh

The sanction cost is recorded as 440.51 (₹ lakh).

VerifiedOfficial record

Maintenance cost due

₹31.88 lakh

The “5 Years Maintenance Cost Due” column shows 31.88 (₹ lakh).

VerifiedOfficial record

Dates and obligations

When the work was awarded and completed, and how long the contractor must maintain it.

Completion date

31-07-2015

The completion date column reads “Financial: 22-11-2016/ Physical: 31-07-2015”; the physical completion date is 31-07-2015.

Completion Date: Financial: 22-11-2016/ Physical: 31-07-2015

[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 1

VerifiedOfficial record

Defect liability / maintenance period

5 years

The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.

…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…

[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40

VerifiedOfficial record

Scope and condition

What the work was meant to include, and what inspections and audits recorded.

Planned scope

10.900 km

Road length 10.900 km; 10.900 km recorded as completed.

VerifiedOfficial record

Stage of work

Maintenance

OMMAS records the stage of progress as “Maintenance”.

VerifiedOfficial record