Project record
MRL1-Huvinakatte to SH 84 Via Talekoppa,Maranahally
PMGSY-II · package KN25101 · Gubbi block · Maintenance
- Location
- Gubbi block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL1-Huvinakatte to SH 84 Via Talekoppa,Maranahally
OMMAS lists PMGSY-II work KN25101 as “MRL1-Huvinakatte to SH 84 Via Talekoppa,Maranahally”.
Road Name / Bridge Name: MRL1-Huvinakatte to SH 84 Via Talekoppa,Maranahally
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 1
Project / work ID
KN25101
OMMAS package number KN25101.
Package No.: KN25101
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 1
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 1
Contractor
N G RAMALINGE GOWDA [04 Mar 2014], Druva eletricals [04 Mar 2014], Druva eletricals
OMMAS lists the contractor for this work as “N G RAMALINGE GOWDA [04 Mar 2014], Druva eletricals [04 Mar 2014], Druva eletricals”.
Contractor Name: N G RAMALINGE GOWDA [04 Mar 2014], Druva eletricals [04 Mar 2014], Druva eletricals [04 Mar 2014]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 1
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹440.51 lakh
The sanction cost is recorded as 440.51 (₹ lakh).
Sanction Cost: 440.51
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 1
Maintenance cost due
₹31.88 lakh
The “5 Years Maintenance Cost Due” column shows 31.88 (₹ lakh).
5 Years Maintenance Cost Due: 31.88
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 1
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-07-2015
The completion date column reads “Financial: 22-11-2016/ Physical: 31-07-2015”; the physical completion date is 31-07-2015.
Completion Date: Financial: 22-11-2016/ Physical: 31-07-2015
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 1
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
10.900 km
Road length 10.900 km; 10.900 km recorded as completed.
Road Length (Kms): 10.900
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 1
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance