Project record
MRL2-Kantevaderahally To Kolala
PMGSY-II · package KN25102 · Koratagere block · Maintenance
- Location
- Koratagere block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL2-Kantevaderahally To Kolala
OMMAS lists PMGSY-II work KN25102 as “MRL2-Kantevaderahally To Kolala”.
Road Name / Bridge Name: MRL2-Kantevaderahally To Kolala
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 1
Project / work ID
KN25102
OMMAS package number KN25102.
Package No.: KN25102
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 1
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 1
Contractor
A.D.Balaramaiah
OMMAS lists the contractor for this work as “A.D.Balaramaiah”.
Contractor Name: A.D.Balaramaiah [05 Mar 2014]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 1
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹498.80 lakh
The sanction cost is recorded as 498.80 (₹ lakh).
Sanction Cost: 498.80
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 1
Maintenance cost due
₹27.78 lakh
The “5 Years Maintenance Cost Due” column shows 27.78 (₹ lakh).
5 Years Maintenance Cost Due: 27.78
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 1
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
01-01-2017
The completion date column reads “Financial: 17-08-2017/ Physical: 01-01-2017”; the physical completion date is 01-01-2017.
Completion Date: Financial: 17-08-2017/ Physical: 01-01-2017
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 1
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
9.500 km
Road length 9.500 km; 9.500 km recorded as completed.
Road Length (Kms): 9.500
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 1
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 1