Project record
T05 - Bupuru Thanda to T-05
PMGSY-II · package KN25109 · Pavagada block · Completed
- Location
- Pavagada block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
T05 - Bupuru Thanda to T-05
OMMAS lists PMGSY-II work KN25109 as “T05 - Bupuru Thanda to T-05”.
Road Name / Bridge Name: T05 - Bupuru Thanda to T-05
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 2
Project / work ID
KN25109
OMMAS package number KN25109.
Package No.: KN25109
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 2
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 2
Contractor
JayaPrakash
OMMAS lists the contractor for this work as “JayaPrakash”.
Contractor Name: JayaPrakash [26 May 2014]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 2
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹325.15 lakh
The sanction cost is recorded as 325.15 (₹ lakh).
Sanction Cost: 325.15
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 2
Maintenance cost due
₹21.57 lakh
The “5 Years Maintenance Cost Due” column shows 21.57 (₹ lakh).
5 Years Maintenance Cost Due: 21.57
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 2
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
03-02-2017
The completion date column reads “Financial: 28-03-2018/ Physical: 03-02-2017”; the physical completion date is 03-02-2017.
Completion Date: Financial: 28-03-2018/ Physical: 03-02-2017
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 2
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
7.370 km
Road length 7.370 km; 7.370 km recorded as completed.
Road Length (Kms): 7.370
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 2
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 2