Project record
MRL3-Manangi Thanda T-01 to Biderekere Gollarahatti
PMGSY-II · package KN25111 · Sira block · Maintenance
- Location
- Sira block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL3-Manangi Thanda T-01 to Biderekere Gollarahatti
OMMAS lists PMGSY-II work KN25111 as “MRL3-Manangi Thanda T-01 to Biderekere Gollarahatti”.
Road Name / Bridge Name: MRL3-Manangi Thanda T-01 to Biderekere Gollarahatti
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 2
Project / work ID
KN25111
OMMAS package number KN25111.
Package No.: KN25111
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 2
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 2
Contractor
S PRASANNAKUMAR
OMMAS lists the contractor for this work as “S PRASANNAKUMAR”.
Contractor Name: S PRASANNAKUMAR [26 May 2014]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 2
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹200.23 lakh
The sanction cost is recorded as 200.23 (₹ lakh).
Sanction Cost: 200.23
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 2
Maintenance cost due
₹12.32 lakh
The “5 Years Maintenance Cost Due” column shows 12.32 (₹ lakh).
5 Years Maintenance Cost Due: 12.32
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 2
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
28-03-2017
The completion date column reads “Financial: 09-04-2018/ Physical: 28-03-2017”; the physical completion date is 28-03-2017.
Completion Date: Financial: 09-04-2018/ Physical: 28-03-2017
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 2
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
4.210 km
Road length 4.210 km; 4.210 km recorded as completed.
Road Length (Kms): 4.210
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 2
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 2