Project record
MRL2-Road from Gedlahalli to Tumkur-Kunigal road via Gularive, Moodlakodipalya,Manangi,Hosuru .
PMGSY-II · package KN25114 · Tumkur block · Maintenance
- Location
- Tumkur block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
OMMAS lists PMGSY-II work KN25114 as “MRL2-Road from Gedlahalli to Tumkur-Kunigal road via Gularive, Moodlakodipalya,Manangi,Hosuru .”.
Road Name / Bridge Name: MRL2-Road from Gedlahalli to Tumkur-Kunigal road via Gularive, Moodlakodipalya,Manangi,Hosuru .
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 3
Project / work ID
KN25114
OMMAS package number KN25114.
Package No.: KN25114
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 3
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 3
Contractor
OMMAS lists the contractor for this work as “H.NARAYANAPPA [05 Mar 2014], Mahathe Electricals [05 Mar 2014], Mahathe Electricals [05 Mar 2014], Mahathe Electricals”.
Contractor Name: H.NARAYANAPPA [05 Mar 2014], Mahathe Electricals [05 Mar 2014], Mahathe Electricals [05 Mar 2014], Mahathe Electricals [05 Mar 2014]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 3
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹503.11 lakh
The sanction cost is recorded as 503.11 (₹ lakh).
Sanction Cost: 503.11
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 3
Maintenance cost due
₹29.68 lakh
The “5 Years Maintenance Cost Due” column shows 29.68 (₹ lakh).
5 Years Maintenance Cost Due: 29.68
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 3
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-10-2015
The completion date column reads “Financial: 21-06-2017/ Physical: 31-10-2015”; the physical completion date is 31-10-2015.
Completion Date: Financial: 21-06-2017/ Physical: 31-10-2015
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 3
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
10.150 km
Road length 10.150 km; 10.150 km recorded as completed.
Road Length (Kms): 10.150
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 3
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 3