Project record
MRL1-Dandinashivara to SH-19 Via D.Hosahally,Heggere, Lakkasandra,& Banasandrapalya
PMGSY-II · package KN25115 · Turuvekere block · Maintenance
- Location
- Turuvekere block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL1-Dandinashivara to SH-19 Via D.Hosahally,Heggere, Lakkasandra,& Banasandrapalya
OMMAS lists PMGSY-II work KN25115 as “MRL1-Dandinashivara to SH-19 Via D.Hosahally,Heggere, Lakkasandra,& Banasandrapalya”.
Road Name / Bridge Name: MRL1-Dandinashivara to SH-19 Via D.Hosahally,Heggere, Lakkasandra,& Banasandrapalya
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 3
Project / work ID
KN25115
OMMAS package number KN25115.
Package No.: KN25115
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 3
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 3
Contractor
K L Manjunath Reddy
OMMAS lists the contractor for this work as “K L Manjunath Reddy”.
Contractor Name: K L Manjunath Reddy [13 May 2014]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 3
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹363.38 lakh
The sanction cost is recorded as 363.38 (₹ lakh).
Sanction Cost: 363.38
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 3
Maintenance cost due
₹26.94 lakh
The “5 Years Maintenance Cost Due” column shows 26.94 (₹ lakh).
5 Years Maintenance Cost Due: 26.94
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 3
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-01-2017
The completion date column reads “Financial: 22-06-2017/ Physical: 31-01-2017”; the physical completion date is 31-01-2017.
Completion Date: Financial: 22-06-2017/ Physical: 31-01-2017
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 3
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
8.000 km
Road length 8.000 km; 8.000 km recorded as completed.
Road Length (Kms): 8.000
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 3
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-II (CSV export), p. 3