Project record
MRL19-Taluk border to NH150A via Anekere Thore mavinahalli and Bhuvanalli
PMGSY-III · package KN25120 · Turuvekere block · Maintenance
- Location
- Turuvekere block, Tumakuru district
- Alignment drawn
- 419 m · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL19-Taluk border to NH150A via Anekere Thore mavinahalli and Bhuvanalli
OMMAS lists PMGSY-III work KN25120 as “MRL19-Taluk border to NH150A via Anekere Thore mavinahalli and Bhuvanalli”.
Road Name / Bridge Name: MRL19-Taluk border to NH150A via Anekere Thore mavinahalli and Bhuvanalli
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9
Project / work ID
KN25120
OMMAS package number KN25120.
Package No.: KN25120
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9
Contractor
Bhoomara Builders
OMMAS lists the contractor for this work as “Bhoomara Builders”.
Contractor Name: Bhoomara Builders [12 Aug 2020]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹225.17 lakh
The sanction cost is recorded as 225.17 (₹ lakh).
Sanction Cost: 225.17
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9
Maintenance cost due
₹21.42 lakh
The “5 Years Maintenance Cost Due” column shows 21.42 (₹ lakh).
5 Years Maintenance Cost Due: 21.42
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
29-02-2024
The completion date column reads “Financial: 05-02-2025/ Physical: 29-02-2024”; the physical completion date is 29-02-2024.
Completion Date: Financial: 05-02-2025/ Physical: 29-02-2024
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
3.720 km
Road length 3.720 km; 3.720 km recorded as completed.
Road Length (Kms): 3.720
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9