Project record
MRL17-VR 252 (Nagalapura road) to NH150 A via Beediganahalli
PMGSY-III · package KN25121 · Turuvekere block · Maintenance
- Location
- Turuvekere block, Tumakuru district
- Alignment drawn
- 14 m · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL17-VR 252 (Nagalapura road) to NH150 A via Beediganahalli
OMMAS lists PMGSY-III work KN25121 as “MRL17-VR 252 (Nagalapura road) to NH150 A via Beediganahalli”.
Road Name / Bridge Name: MRL17-VR 252 (Nagalapura road) to NH150 A via Beediganahalli
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9
Project / work ID
KN25121
OMMAS package number KN25121.
Package No.: KN25121
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9
Contractor
Bhoomara Builders
OMMAS lists the contractor for this work as “Bhoomara Builders”.
Contractor Name: Bhoomara Builders [12 Aug 2020]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹384.82 lakh
The sanction cost is recorded as 384.82 (₹ lakh).
Sanction Cost: 384.82
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9
Maintenance cost due
₹35.17 lakh
The “5 Years Maintenance Cost Due” column shows 35.17 (₹ lakh).
5 Years Maintenance Cost Due: 35.17
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
29-02-2024
The completion date column reads “Financial: 05-02-2025/ Physical: 29-02-2024”; the physical completion date is 29-02-2024.
Completion Date: Financial: 05-02-2025/ Physical: 29-02-2024
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
6.110 km
Road length 6.110 km; 6.100 km recorded as completed.
Road Length (Kms): 6.110
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9