Skip to content
CivicProof

Project record

MRL07-NH 150A near Banasandra to Neergunda via Venkatapura.

PMGSY-III · package KN25124 · Turuvekere block · Maintenance

Location
Turuvekere block, Tumakuru district
Alignment drawn
1.4 km · official GIS
Documents
2
Verified facts
10 of 10
10 verified in official records0 open questions

Who is responsible

The project, the agency that executes it, and the contractor named in the records.

Project

MRL07-NH 150A near Banasandra to Neergunda via Venkatapura.

OMMAS lists PMGSY-III work KN25124 as “MRL07-NH 150A near Banasandra to Neergunda via Venkatapura.”.

Road Name / Bridge Name: MRL07-NH 150A near Banasandra to Neergunda via Venkatapura.

[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9

VerifiedOfficial record

Project / work ID

KN25124

OMMAS package number KN25124.

VerifiedOfficial record

Responsible agency

DPIU Of Tumkur

The programme implementation unit is recorded as “DPIU Of Tumkur”.

Programme Implementation Unit: DPIU Of Tumkur

[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9

VerifiedOfficial record

Contractor

N G RAMALINGE GOWDA

OMMAS lists the contractor for this work as “N G RAMALINGE GOWDA”.

Contractor Name: N G RAMALINGE GOWDA [25 Sep 2020]

[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9

VerifiedOfficial record

Money

Amounts as stated in the records, with their units.

Sanctioned cost

₹272.56 lakh

The sanction cost is recorded as 272.56 (₹ lakh).

VerifiedOfficial record

Maintenance cost due

₹30.22 lakh

The “5 Years Maintenance Cost Due” column shows 30.22 (₹ lakh).

VerifiedOfficial record

Dates and obligations

When the work was awarded and completed, and how long the contractor must maintain it.

Completion date

16-06-2023

The completion date column reads “Financial: 29-03-2024/ Physical: 16-06-2023”; the physical completion date is 16-06-2023.

Completion Date: Financial: 29-03-2024/ Physical: 16-06-2023

[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9

VerifiedOfficial record

Defect liability / maintenance period

5 years

The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.

…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…

[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40

VerifiedOfficial record

Scope and condition

What the work was meant to include, and what inspections and audits recorded.

Planned scope

5.250 km

Road length 5.250 km; 5.250 km recorded as completed.

VerifiedOfficial record

Stage of work

Maintenance

OMMAS records the stage of progress as “Maintenance”.

VerifiedOfficial record