Project record
Contruction of Longspan Bridge at ch. 6.75 km to the road Thammadihalli to Anksandra Via Abbujihalli
PMGSY-III · package KN25127B · C.N.Halli block · Completed
- Location
- C.N.Halli block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 8 of 8
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
OMMAS lists PMGSY-III work KN25127B as “Contruction of Longspan Bridge at ch. 6.75 km to the road Thammadihalli to Anksandra Via Abbujihalli”.
Road Name / Bridge Name: Contruction of Longspan Bridge at ch. 6.75 km to the road Thammadihalli to Anksandra Via Abbujihalli
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 1
Project / work ID
KN25127B
OMMAS package number KN25127B.
Package No.: KN25127B
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 1
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 1
Contractor
M/s. Apoorva Construction Co.,
OMMAS lists the contractor for this work as “M/s. Apoorva Construction Co.,”.
Contractor Name: M/s. Apoorva Construction Co., [15 Jan 2021]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 1
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹107.00 lakh
The sanction cost is recorded as 107.00 (₹ lakh).
Sanction Cost: 107.00
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 1
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
24-08-2022
The completion date column reads “Financial: 28-05-2024/ Physical: 24-08-2022”; the physical completion date is 24-08-2022.
Completion Date: Financial: 28-05-2024/ Physical: 24-08-2022
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 1
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[9]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 1