Project record
T01-Shettikere to NH150A Via Hosapalya , Kallubhavipalya ,Gantiganapalya, Thippanapalya, Chunganahalli,Masthayyanapalya and Malgondanahallli
PMGSY-III · package KN25128 · C.N.Halli block · Maintenance
- Location
- C.N.Halli block, Tumakuru district
- Alignment drawn
- 1.5 km · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
OMMAS lists PMGSY-III work KN25128 as “T01-Shettikere to NH150A Via Hosapalya , Kallubhavipalya ,Gantiganapalya, Thippanapalya, Chunganahalli,Masthayyanapalya and Malgondanahallli”.
Road Name / Bridge Name: T01-Shettikere to NH150A Via Hosapalya , Kallubhavipalya ,Gantiganapalya, Thippanapalya, Chunganahalli,Masthayyanapalya and Malgondanahallli
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2
Project / work ID
KN25128
OMMAS package number KN25128.
Package No.: KN25128
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2
Contractor
M/s Ganapathi Stone Crusher
OMMAS lists the contractor for this work as “M/s Ganapathi Stone Crusher”.
Contractor Name: M/s Ganapathi Stone Crusher [14 Aug 2020]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹955.70 lakh
The sanction cost is recorded as 955.70 (₹ lakh).
Sanction Cost: 955.70
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2
Maintenance cost due
₹73.87 lakh
The “5 Years Maintenance Cost Due” column shows 73.87 (₹ lakh).
5 Years Maintenance Cost Due: 73.87
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
11-07-2022
The completion date column reads “Financial: 30-03-2024/ Physical: 11-07-2022”; the physical completion date is 11-07-2022.
Completion Date: Financial: 30-03-2024/ Physical: 11-07-2022
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
12.636 km
Road length 12.636 km; 12.434 km recorded as completed.
Road Length (Kms): 12.636
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2