Project record
MRL11-Machagondanahalli to Pandithanahalli Hand Post via Kesaramadu and K.Palasandra
PMGSY-III · package KN25132 · Tumkur block · Maintenance
- Location
- Tumkur block, Tumakuru district
- Alignment drawn
- 4.0 km · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL11-Machagondanahalli to Pandithanahalli Hand Post via Kesaramadu and K.Palasandra
OMMAS lists PMGSY-III work KN25132 as “MRL11-Machagondanahalli to Pandithanahalli Hand Post via Kesaramadu and K.Palasandra”.
Road Name / Bridge Name: MRL11-Machagondanahalli to Pandithanahalli Hand Post via Kesaramadu and K.Palasandra
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 8
Project / work ID
KN25132
OMMAS package number KN25132.
Package No.: KN25132
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 8
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 8
Contractor
H.NARAYANAPPA [14 Aug 2020], H.NARAYANAPPA
OMMAS lists the contractor for this work as “H.NARAYANAPPA [14 Aug 2020], H.NARAYANAPPA”.
Contractor Name: H.NARAYANAPPA [14 Aug 2020], H.NARAYANAPPA [14 Aug 2020]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 8
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹230.05 lakh
The sanction cost is recorded as 230.05 (₹ lakh).
Sanction Cost: 230.05
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 8
Maintenance cost due
₹22.68 lakh
The “5 Years Maintenance Cost Due” column shows 22.68 (₹ lakh).
5 Years Maintenance Cost Due: 22.68
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 8
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-09-2021
The completion date column reads “Financial: 16-10-2024/ Physical: 30-09-2021”; the physical completion date is 30-09-2021.
Completion Date: Financial: 16-10-2024/ Physical: 30-09-2021
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 8
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
3.970 km
Road length 3.970 km; 3.970 km recorded as completed.
Road Length (Kms): 3.970
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 8
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 8