Project record
MRL01-Kumkumanahalli to Bellavi via Heggere, Mudigere, Ballapura, Singrihalli
PMGSY-III · package KN25133 · Tumkur block · Maintenance
- Location
- Tumkur block, Tumakuru district
- Alignment drawn
- 2.3 km · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL01-Kumkumanahalli to Bellavi via Heggere, Mudigere, Ballapura, Singrihalli
OMMAS lists PMGSY-III work KN25133 as “MRL01-Kumkumanahalli to Bellavi via Heggere, Mudigere, Ballapura, Singrihalli”.
Road Name / Bridge Name: MRL01-Kumkumanahalli to Bellavi via Heggere, Mudigere, Ballapura, Singrihalli
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9
Project / work ID
KN25133
OMMAS package number KN25133.
Package No.: KN25133
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9
Contractor
N G RAMALINGE GOWDA
OMMAS lists the contractor for this work as “N G RAMALINGE GOWDA”.
Contractor Name: N G RAMALINGE GOWDA [23 Sep 2020]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹623.33 lakh
The sanction cost is recorded as 623.33 (₹ lakh).
Sanction Cost: 623.33
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9
Maintenance cost due
₹53.30 lakh
The “5 Years Maintenance Cost Due” column shows 53.30 (₹ lakh).
5 Years Maintenance Cost Due: 53.30
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
10-07-2024
The completion date column reads “Financial: 29-01-2022/ Physical: 10-07-2024”; the physical completion date is 10-07-2024.
Completion Date: Financial: 29-01-2022/ Physical: 10-07-2024
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
9.678 km
Road length 9.678 km; 9.990 km recorded as completed.
Road Length (Kms): 9.678
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 9