Project record
MRL14-YT Road to SH 47 Via Honnenahally, Bochihally, Sugur, and Mathigatta
PMGSY-III · package KN25139 · Tiptur block · Maintenance
- Location
- Tiptur block, Tumakuru district
- Alignment drawn
- 3.3 km · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL14-YT Road to SH 47 Via Honnenahally, Bochihally, Sugur, and Mathigatta
OMMAS lists PMGSY-III work KN25139 as “MRL14-YT Road to SH 47 Via Honnenahally, Bochihally, Sugur, and Mathigatta”.
Road Name / Bridge Name: MRL14-YT Road to SH 47 Via Honnenahally, Bochihally, Sugur, and Mathigatta
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 7
Project / work ID
KN25139
OMMAS package number KN25139.
Package No.: KN25139
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 7
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 7
Contractor
BMRG PROJECTS INDIA PRIVATE LIMITED [04 Aug 2020], BMRG PROJECTS INDIA PRIVATE LIMITED
OMMAS lists the contractor for this work as “BMRG PROJECTS INDIA PRIVATE LIMITED [04 Aug 2020], BMRG PROJECTS INDIA PRIVATE LIMITED”.
Contractor Name: BMRG PROJECTS INDIA PRIVATE LIMITED [04 Aug 2020], BMRG PROJECTS INDIA PRIVATE LIMITED [04 Aug 2020]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 7
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹400.54 lakh
The sanction cost is recorded as 400.54 (₹ lakh).
Sanction Cost: 400.54
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 7
Maintenance cost due
₹32.77 lakh
The “5 Years Maintenance Cost Due” column shows 32.77 (₹ lakh).
5 Years Maintenance Cost Due: 32.77
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 7
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-10-2021
The completion date column reads “Financial: 28-05-2024/ Physical: 30-10-2021”; the physical completion date is 30-10-2021.
Completion Date: Financial: 28-05-2024/ Physical: 30-10-2021
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 7
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
5.570 km
Road length 5.570 km; 5.100 km recorded as completed.
Road Length (Kms): 5.570
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 7
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 7