Project record
MRL16-Bommenahally to Halkurki via Kalammanagudda, Bommenahally L.Thandya, Lambanitandya, Muddenahalli Thandya,and Muddenahalli. H
PMGSY-III · package KN25141 · Tiptur block · Maintenance
- Location
- Tiptur block, Tumakuru district
- Alignment drawn
- 11 m · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
OMMAS lists PMGSY-III work KN25141 as “MRL16-Bommenahally to Halkurki via Kalammanagudda, Bommenahally L.Thandya, Lambanitandya, Muddenahalli Thandya,and Muddenahalli. H”.
Road Name / Bridge Name: MRL16-Bommenahally to Halkurki via Kalammanagudda, Bommenahally L.Thandya, Lambanitandya, Muddenahalli Thandya,and Muddenahalli. H
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 7
Project / work ID
KN25141
OMMAS package number KN25141.
Package No.: KN25141
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 7
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 7
Contractor
M/S K Gowda and Company
OMMAS lists the contractor for this work as “M/S K Gowda and Company”.
Contractor Name: M/S K Gowda and Company [09 Dec 2020]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 7
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹253.20 lakh
The sanction cost is recorded as 253.20 (₹ lakh).
Sanction Cost: 253.20
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 7
Maintenance cost due
₹28.76 lakh
The “5 Years Maintenance Cost Due” column shows 28.76 (₹ lakh).
5 Years Maintenance Cost Due: 28.76
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 7
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
15-11-2022
The completion date column reads “Financial: 09-10-2024/ Physical: 15-11-2022”; the physical completion date is 15-11-2022.
Completion Date: Financial: 09-10-2024/ Physical: 15-11-2022
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 7
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
4.890 km
Road length 4.890 km; 4.890 km recorded as completed.
Road Length (Kms): 4.890
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 7
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 7