MRL23-SH-03 to KMT Road via Mannurthimmanahalli,Hanumanthapura,Alalasandra,Kereyagalahalli

PMGSY-III · package KN25144 · Koratagere block · Maintenance

Location
Koratagere block, Tumakuru district
Alignment drawn
1 m · official GIS
Documents
2
Verified facts
10 of 10
10 verified in official records0 open questions

Who is responsible

The project, the agency that executes it, and the contractor named in the records.

Project

OMMAS lists PMGSY-III work KN25144 as “MRL23-SH-03 to KMT Road via Mannurthimmanahalli,Hanumanthapura,Alalasandra,Kereyagalahalli”.

Road Name / Bridge Name: MRL23-SH-03 to KMT Road via Mannurthimmanahalli,Hanumanthapura,Alalasandra,Kereyagalahalli

[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 3

VerifiedOfficial record

Project / work ID

KN25144

OMMAS package number KN25144.

VerifiedOfficial record

Responsible agency

DPIU Of Tumkur

The programme implementation unit is recorded as “DPIU Of Tumkur”.

Programme Implementation Unit: DPIU Of Tumkur

[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 3

VerifiedOfficial record

Contractor

M/s Dodde Gowda Construction.Pvt.Ltd [31 Aug 2020], M/s Dodde Gowda Construction.Pvt.Ltd

OMMAS lists the contractor for this work as “M/s Dodde Gowda Construction.Pvt.Ltd [31 Aug 2020], M/s Dodde Gowda Construction.Pvt.Ltd”.

Contractor Name: M/s Dodde Gowda Construction.Pvt.Ltd [31 Aug 2020], M/s Dodde Gowda Construction.Pvt.Ltd [31 Aug 2020]

[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 3

VerifiedOfficial record

Money

Amounts as stated in the records, with their units.

Sanctioned cost

₹199.61 lakh

The sanction cost is recorded as 199.61 (₹ lakh).

VerifiedOfficial record

Maintenance cost due

₹15.45 lakh

The “5 Years Maintenance Cost Due” column shows 15.45 (₹ lakh).

VerifiedOfficial record

Dates and obligations

When the work was awarded and completed, and how long the contractor must maintain it.

Completion date

21-06-2022

The completion date column reads “Financial: 22-09-2022/ Physical: 21-06-2022”; the physical completion date is 21-06-2022.

Completion Date: Financial: 22-09-2022/ Physical: 21-06-2022

[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 3

VerifiedOfficial record

Defect liability / maintenance period

5 years

The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.

…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…

[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40

VerifiedOfficial record

Scope and condition

What the work was meant to include, and what inspections and audits recorded.

Planned scope

3.030 km

Road length 3.030 km; 3.030 km recorded as completed.

VerifiedOfficial record

Stage of work

Maintenance

OMMAS records the stage of progress as “Maintenance”.

VerifiedOfficial record