Project record
T03-Kathinagenahalli to koratagere-Madhugiri taluk border via Chilagonahalli, yadagere,kalkere,Gubalgutte
PMGSY-III · package KN25147 · Koratagere block · Maintenance
- Location
- Koratagere block, Tumakuru district
- Alignment drawn
- 5 m · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
OMMAS lists PMGSY-III work KN25147 as “T03-Kathinagenahalli to koratagere-Madhugiri taluk border via Chilagonahalli, yadagere,kalkere,Gubalgutte”.
Road Name / Bridge Name: T03-Kathinagenahalli to koratagere-Madhugiri taluk border via Chilagonahalli, yadagere,kalkere,Gubalgutte
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 3
Project / work ID
KN25147
OMMAS package number KN25147.
Package No.: KN25147
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 3
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 3
Contractor
SRP CONSTRUCTIONS [20 Jun 2020], SRP CONSTRUCTIONS
OMMAS lists the contractor for this work as “SRP CONSTRUCTIONS [20 Jun 2020], SRP CONSTRUCTIONS”.
Contractor Name: SRP CONSTRUCTIONS [20 Jun 2020], SRP CONSTRUCTIONS [20 Jun 2020]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 3
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹282.19 lakh
The sanction cost is recorded as 282.19 (₹ lakh).
Sanction Cost: 282.19
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 3
Maintenance cost due
₹31.08 lakh
The “5 Years Maintenance Cost Due” column shows 31.08 (₹ lakh).
5 Years Maintenance Cost Due: 31.08
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 3
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
03-06-2022
The completion date column reads “Financial: 22-09-2022/ Physical: 03-06-2022”; the physical completion date is 03-06-2022.
Completion Date: Financial: 22-09-2022/ Physical: 03-06-2022
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 3
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
5.430 km
Road length 5.430 km; 5.430 km recorded as completed.
Road Length (Kms): 5.430
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 3
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 3