Project record
MRL11-MDR-09 to SH-159 Via Bramsamudra
PMGSY-III · package KN25150 · Madhugiri block · Completed
- Location
- Madhugiri block, Tumakuru district
- Alignment drawn
- 478 m · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL11-MDR-09 to SH-159 Via Bramsamudra
OMMAS lists PMGSY-III work KN25150 as “MRL11-MDR-09 to SH-159 Via Bramsamudra”.
Road Name / Bridge Name: MRL11-MDR-09 to SH-159 Via Bramsamudra
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 5
Project / work ID
KN25150
OMMAS package number KN25150.
Package No.: KN25150
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 5
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 5
Contractor
C.R.Harish [04 Sep 2020], C.R.Harish
OMMAS lists the contractor for this work as “C.R.Harish [04 Sep 2020], C.R.Harish”.
Contractor Name: C.R.Harish [04 Sep 2020], C.R.Harish [04 Sep 2020]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 5
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹335.65 lakh
The sanction cost is recorded as 335.65 (₹ lakh).
Sanction Cost: 335.65
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 5
Maintenance cost due
₹29.25 lakh
The “5 Years Maintenance Cost Due” column shows 29.25 (₹ lakh).
5 Years Maintenance Cost Due: 29.25
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 5
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
08-01-2026
The completion date column reads “Financial: -/ Physical: 08-01-2026”; the physical completion date is 08-01-2026.
Completion Date: Financial: -/ Physical: 08-01-2026
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 5
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
5.110 km
Road length 5.110 km; 5.110 km recorded as completed.
Road Length (Kms): 5.110
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 5
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 5