Project record
MRL35-Veeropagondanahalli to Dabbegatta Via K. Gollarahatti ,Bittanakurke
PMGSY-III · package KN25152 · Madhugiri block · Maintenance
- Location
- Madhugiri block, Tumakuru district
- Alignment drawn
- 51 m · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL35-Veeropagondanahalli to Dabbegatta Via K. Gollarahatti ,Bittanakurke
OMMAS lists PMGSY-III work KN25152 as “MRL35-Veeropagondanahalli to Dabbegatta Via K. Gollarahatti ,Bittanakurke”.
Road Name / Bridge Name: MRL35-Veeropagondanahalli to Dabbegatta Via K. Gollarahatti ,Bittanakurke
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 5
Project / work ID
KN25152
OMMAS package number KN25152.
Package No.: KN25152
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 5
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 5
Contractor
VINYAS BUILDERS [22 Jul 2020], VINYAS BUILDERS
OMMAS lists the contractor for this work as “VINYAS BUILDERS [22 Jul 2020], VINYAS BUILDERS”.
Contractor Name: VINYAS BUILDERS [22 Jul 2020], VINYAS BUILDERS [22 Jul 2020]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 5
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹297.50 lakh
The sanction cost is recorded as 297.50 (₹ lakh).
Sanction Cost: 297.50
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 5
Maintenance cost due
₹34.17 lakh
The “5 Years Maintenance Cost Due” column shows 34.17 (₹ lakh).
5 Years Maintenance Cost Due: 34.17
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 5
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
26-07-2022
The completion date column reads “Financial: 29-05-2024/ Physical: 26-07-2022”; the physical completion date is 26-07-2022.
Completion Date: Financial: 29-05-2024/ Physical: 26-07-2022
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 5
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
5.970 km
Road length 5.970 km; 5.970 km recorded as completed.
Road Length (Kms): 5.970
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 5
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 5