Skip to content
CivicProof

Project record

MRL05-Dwaranakunte to S.A Road via Nidhaghatta

PMGSY-III · package KN25158 · Sira block · Progress

Location
Sira block, Tumakuru district
Alignment drawn
15 m · official GIS
Documents
2
Verified facts
9 of 9
9 verified in official records0 open questions

Who is responsible

The project, the agency that executes it, and the contractor named in the records.

Project

MRL05-Dwaranakunte to S.A Road via Nidhaghatta

OMMAS lists PMGSY-III work KN25158 as “MRL05-Dwaranakunte to S.A Road via Nidhaghatta”.

Road Name / Bridge Name: MRL05-Dwaranakunte to S.A Road via Nidhaghatta

[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 6

VerifiedOfficial record

Project / work ID

KN25158

OMMAS package number KN25158.

VerifiedOfficial record

Responsible agency

DPIU Of Tumkur

The programme implementation unit is recorded as “DPIU Of Tumkur”.

Programme Implementation Unit: DPIU Of Tumkur

[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 6

VerifiedOfficial record

Contractor

C.R.Harish [19 Jun 2020], C.R.Harish

OMMAS lists the contractor for this work as “C.R.Harish [19 Jun 2020], C.R.Harish”.

Contractor Name: C.R.Harish [19 Jun 2020], C.R.Harish [19 Jun 2020]

[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 6

VerifiedOfficial record

Money

Amounts as stated in the records, with their units.

Sanctioned cost

₹353.74 lakh

The sanction cost is recorded as 353.74 (₹ lakh).

VerifiedOfficial record

Maintenance cost due

₹29.70 lakh

The “5 Years Maintenance Cost Due” column shows 29.70 (₹ lakh).

VerifiedOfficial record

Dates and obligations

When the work was awarded and completed, and how long the contractor must maintain it.

Defect liability / maintenance period

5 years

The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.

…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…

[10]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40

VerifiedOfficial record

Scope and condition

What the work was meant to include, and what inspections and audits recorded.

Planned scope

5.190 km

Road length 5.190 km; 0.000 km recorded as completed.

VerifiedOfficial record

Stage of work

Progress

OMMAS records the stage of progress as “Progress”.

VerifiedOfficial record