Project record
MRL05-Dwaranakunte to S.A Road via Nidhaghatta
PMGSY-III · package KN25158 · Sira block · Progress
- Location
- Sira block, Tumakuru district
- Alignment drawn
- 15 m · official GIS
- Documents
- 2
- Verified facts
- 9 of 9
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL05-Dwaranakunte to S.A Road via Nidhaghatta
OMMAS lists PMGSY-III work KN25158 as “MRL05-Dwaranakunte to S.A Road via Nidhaghatta”.
Road Name / Bridge Name: MRL05-Dwaranakunte to S.A Road via Nidhaghatta
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 6
Project / work ID
KN25158
OMMAS package number KN25158.
Package No.: KN25158
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 6
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 6
Contractor
C.R.Harish [19 Jun 2020], C.R.Harish
OMMAS lists the contractor for this work as “C.R.Harish [19 Jun 2020], C.R.Harish”.
Contractor Name: C.R.Harish [19 Jun 2020], C.R.Harish [19 Jun 2020]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 6
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹353.74 lakh
The sanction cost is recorded as 353.74 (₹ lakh).
Sanction Cost: 353.74
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 6
Maintenance cost due
₹29.70 lakh
The “5 Years Maintenance Cost Due” column shows 29.70 (₹ lakh).
5 Years Maintenance Cost Due: 29.70
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 6
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[10]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
5.190 km
Road length 5.190 km; 0.000 km recorded as completed.
Road Length (Kms): 5.190
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 6
Stage of work
Progress
OMMAS records the stage of progress as “Progress”.
Stage of Progress: Progress
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 6