Project record
MRL18-SH-84 to Chikkagrahara via yaramadanahally,punajihally,Malanahally
PMGSY-III · package KN25160 · Sira block · Maintenance
- Location
- Sira block, Tumakuru district
- Alignment drawn
- 603 m · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL18-SH-84 to Chikkagrahara via yaramadanahally,punajihally,Malanahally
OMMAS lists PMGSY-III work KN25160 as “MRL18-SH-84 to Chikkagrahara via yaramadanahally,punajihally,Malanahally”.
Road Name / Bridge Name: MRL18-SH-84 to Chikkagrahara via yaramadanahally,punajihally,Malanahally
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 6
Project / work ID
KN25160
OMMAS package number KN25160.
Package No.: KN25160
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 6
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 6
Contractor
M/s Ganapathi Stone Crusher [21 Aug 2020], M/s Ganapathi Stone Crusher
OMMAS lists the contractor for this work as “M/s Ganapathi Stone Crusher [21 Aug 2020], M/s Ganapathi Stone Crusher”.
Contractor Name: M/s Ganapathi Stone Crusher [21 Aug 2020], M/s Ganapathi Stone Crusher [21 Aug 2020]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 6
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹644.42 lakh
The sanction cost is recorded as 644.42 (₹ lakh).
Sanction Cost: 644.42
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 6
Maintenance cost due
₹54.60 lakh
The “5 Years Maintenance Cost Due” column shows 54.60 (₹ lakh).
5 Years Maintenance Cost Due: 54.60
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 6
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
06-05-2024
The completion date column reads “Financial: -/ Physical: 06-05-2024”; the physical completion date is 06-05-2024.
Completion Date: Financial: -/ Physical: 06-05-2024
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 6
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
9.540 km
Road length 9.540 km; 8.877 km recorded as completed.
Road Length (Kms): 9.540
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 6
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 6