MRL01-NH-234 to Ramalingapura-Sakshihalli MDR via Balapura,Durgowanahatti
PMGSY-III · package KN25161 · Sira block · Progress
- Location
- Sira block, Tumakuru district
- Alignment drawn
- 44 m · official GIS
- Documents
- 2
- Verified facts
- 9 of 9
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL01-NH-234 to Ramalingapura-Sakshihalli MDR via Balapura,Durgowanahatti
OMMAS lists PMGSY-III work KN25161 as “MRL01-NH-234 to Ramalingapura-Sakshihalli MDR via Balapura,Durgowanahatti”.
Road Name / Bridge Name: MRL01-NH-234 to Ramalingapura-Sakshihalli MDR via Balapura,Durgowanahatti
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 7
Project / work ID
KN25161
OMMAS package number KN25161.
Package No.: KN25161
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 7
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 7
Contractor
C.R.Harish [19 Jun 2020], C.R.Harish
OMMAS lists the contractor for this work as “C.R.Harish [19 Jun 2020], C.R.Harish”.
Contractor Name: C.R.Harish [19 Jun 2020], C.R.Harish [19 Jun 2020]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 7
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹309.40 lakh
The sanction cost is recorded as 309.40 (₹ lakh).
Sanction Cost: 309.40
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 7
Maintenance cost due
₹27.47 lakh
The “5 Years Maintenance Cost Due” column shows 27.47 (₹ lakh).
5 Years Maintenance Cost Due: 27.47
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 7
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[10]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
5.100 km
Road length 5.100 km; 4.860 km recorded as completed.
Road Length (Kms): 5.100
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 7
Stage of work
Progress
OMMAS records the stage of progress as “Progress”.
Stage of Progress: Progress
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 7