Project record
MRL13-Hosakere-Huildore Road to TCB Road Via Pinnenahalli, Madenahalli, Sanganahallli.
PMGSY-III · package KN25163 · Gubbi block · Maintenance
- Location
- Gubbi block, Tumakuru district
- Alignment drawn
- 3.0 km · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL13-Hosakere-Huildore Road to TCB Road Via Pinnenahalli, Madenahalli, Sanganahallli.
OMMAS lists PMGSY-III work KN25163 as “MRL13-Hosakere-Huildore Road to TCB Road Via Pinnenahalli, Madenahalli, Sanganahallli.”.
Road Name / Bridge Name: MRL13-Hosakere-Huildore Road to TCB Road Via Pinnenahalli, Madenahalli, Sanganahallli.
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2
Project / work ID
KN25163
OMMAS package number KN25163.
Package No.: KN25163
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2
Contractor
T L Ashok
OMMAS lists the contractor for this work as “T L Ashok”.
Contractor Name: T L Ashok [25 Jun 2021]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹384.65 lakh
The sanction cost is recorded as 384.65 (₹ lakh).
Sanction Cost: 384.65
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2
Maintenance cost due
₹33.99 lakh
The “5 Years Maintenance Cost Due” column shows 33.99 (₹ lakh).
5 Years Maintenance Cost Due: 33.99
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-10-2021
The completion date column reads “Financial: 06-01-2023/ Physical: 30-10-2021”; the physical completion date is 30-10-2021.
Completion Date: Financial: 06-01-2023/ Physical: 30-10-2021
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
5.940 km
Road length 5.940 km; 5.946 km recorded as completed.
Road Length (Kms): 5.940
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2