MRL13-Hosakere-Huildore Road to TCB Road Via Pinnenahalli, Madenahalli, Sanganahallli.

PMGSY-III · package KN25163 · Gubbi block · Maintenance

Location
Gubbi block, Tumakuru district
Alignment drawn
3.0 km · official GIS
Documents
2
Verified facts
10 of 10
10 verified in official records0 open questions

Who is responsible

The project, the agency that executes it, and the contractor named in the records.

Project

MRL13-Hosakere-Huildore Road to TCB Road Via Pinnenahalli, Madenahalli, Sanganahallli.

OMMAS lists PMGSY-III work KN25163 as “MRL13-Hosakere-Huildore Road to TCB Road Via Pinnenahalli, Madenahalli, Sanganahallli.”.

Road Name / Bridge Name: MRL13-Hosakere-Huildore Road to TCB Road Via Pinnenahalli, Madenahalli, Sanganahallli.

[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2

VerifiedOfficial record

Project / work ID

KN25163

OMMAS package number KN25163.

VerifiedOfficial record

Responsible agency

DPIU Of Tumkur

The programme implementation unit is recorded as “DPIU Of Tumkur”.

Programme Implementation Unit: DPIU Of Tumkur

[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2

VerifiedOfficial record

Contractor

T L Ashok

OMMAS lists the contractor for this work as “T L Ashok”.

VerifiedOfficial record

Money

Amounts as stated in the records, with their units.

Sanctioned cost

₹384.65 lakh

The sanction cost is recorded as 384.65 (₹ lakh).

VerifiedOfficial record

Maintenance cost due

₹33.99 lakh

The “5 Years Maintenance Cost Due” column shows 33.99 (₹ lakh).

VerifiedOfficial record

Dates and obligations

When the work was awarded and completed, and how long the contractor must maintain it.

Completion date

30-10-2021

The completion date column reads “Financial: 06-01-2023/ Physical: 30-10-2021”; the physical completion date is 30-10-2021.

Completion Date: Financial: 06-01-2023/ Physical: 30-10-2021

[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2

VerifiedOfficial record

Defect liability / maintenance period

5 years

The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.

…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…

[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40

VerifiedOfficial record

Scope and condition

What the work was meant to include, and what inspections and audits recorded.

Planned scope

5.940 km

Road length 5.940 km; 5.946 km recorded as completed.

VerifiedOfficial record

Stage of work

Maintenance

OMMAS records the stage of progress as “Maintenance”.