Project record
MRL17-Galaga to Adaguru-Kadaba Road(MDR) Via Muddanahalli, Dodderi, G.Hosahalli.
PMGSY-III · package KN25165 · Gubbi block · Maintenance
- Location
- Gubbi block, Tumakuru district
- Alignment drawn
- 13 m · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL17-Galaga to Adaguru-Kadaba Road(MDR) Via Muddanahalli, Dodderi, G.Hosahalli.
OMMAS lists PMGSY-III work KN25165 as “MRL17-Galaga to Adaguru-Kadaba Road(MDR) Via Muddanahalli, Dodderi, G.Hosahalli.”.
Road Name / Bridge Name: MRL17-Galaga to Adaguru-Kadaba Road(MDR) Via Muddanahalli, Dodderi, G.Hosahalli.
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2
Project / work ID
KN25165
OMMAS package number KN25165.
Package No.: KN25165
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2
Contractor
S. NARAYANA REDDY
OMMAS lists the contractor for this work as “S. NARAYANA REDDY”.
Contractor Name: S. NARAYANA REDDY [06 Jul 2021]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹503.68 lakh
The sanction cost is recorded as 503.68 (₹ lakh).
Sanction Cost: 503.68
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2
Maintenance cost due
₹52.65 lakh
The “5 Years Maintenance Cost Due” column shows 52.65 (₹ lakh).
5 Years Maintenance Cost Due: 52.65
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
20-09-2023
The completion date column reads “Financial: 28-05-2024/ Physical: 20-09-2023”; the physical completion date is 20-09-2023.
Completion Date: Financial: 28-05-2024/ Physical: 20-09-2023
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
9.200 km
Road length 9.200 km; 9.200 km recorded as completed.
Road Length (Kms): 9.200
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 2