Project record
MRL03-Nittur - Sampige Road to Kadaba Via Nandihalli, Hosahatti and B.Hosapalya
PMGSY-III · package KN25167 · Gubbi block · Maintenance
- Location
- Gubbi block, Tumakuru district
- Alignment drawn
- 700 m · official GIS
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
MRL03-Nittur - Sampige Road to Kadaba Via Nandihalli, Hosahatti and B.Hosapalya
OMMAS lists PMGSY-III work KN25167 as “MRL03-Nittur - Sampige Road to Kadaba Via Nandihalli, Hosahatti and B.Hosapalya”.
Road Name / Bridge Name: MRL03-Nittur - Sampige Road to Kadaba Via Nandihalli, Hosahatti and B.Hosapalya
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 3
Project / work ID
KN25167
OMMAS package number KN25167.
Package No.: KN25167
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 3
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 3
Contractor
S. NARAYANA REDDY
OMMAS lists the contractor for this work as “S. NARAYANA REDDY”.
Contractor Name: S. NARAYANA REDDY [06 Jul 2021]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 3
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹174.23 lakh
The sanction cost is recorded as 174.23 (₹ lakh).
Sanction Cost: 174.23
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 3
Maintenance cost due
₹17.56 lakh
The “5 Years Maintenance Cost Due” column shows 17.56 (₹ lakh).
5 Years Maintenance Cost Due: 17.56
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 3
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
13-01-2023
The completion date column reads “Financial: 31-03-2024/ Physical: 13-01-2023”; the physical completion date is 13-01-2023.
Completion Date: Financial: 31-03-2024/ Physical: 13-01-2023
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 3
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
3.070 km
Road length 3.070 km; 3.070 km recorded as completed.
Road Length (Kms): 3.070
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 3
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 3