Project record
MRL15-Honavalli to Chikka Honavalli Gate Via Gyarghatta, Chowdenahally, Hanunthapura, and Suranahally
PMGSY-III · package KN25169 · Tiptur block · Maintenance
- Location
- Tiptur block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
OMMAS lists PMGSY-III work KN25169 as “MRL15-Honavalli to Chikka Honavalli Gate Via Gyarghatta, Chowdenahally, Hanunthapura, and Suranahally”.
Road Name / Bridge Name: MRL15-Honavalli to Chikka Honavalli Gate Via Gyarghatta, Chowdenahally, Hanunthapura, and Suranahally
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 8
Project / work ID
KN25169
OMMAS package number KN25169.
Package No.: KN25169
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 8
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 8
Contractor
B R Sreekantamurthy
OMMAS lists the contractor for this work as “B R Sreekantamurthy”.
Contractor Name: B R Sreekantamurthy [28 Mar 2023]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 8
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹383.24 lakh
The sanction cost is recorded as 383.24 (₹ lakh).
Sanction Cost: 383.24
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 8
Maintenance cost due
₹27.58 lakh
The “5 Years Maintenance Cost Due” column shows 27.58 (₹ lakh).
5 Years Maintenance Cost Due: 27.58
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 8
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
28-02-2024
The completion date column reads “Financial: -/ Physical: 28-02-2024”; the physical completion date is 28-02-2024.
Completion Date: Financial: -/ Physical: 28-02-2024
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 8
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
4.820 km
Road length 4.820 km; 5.050 km recorded as completed.
Road Length (Kms): 4.820
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 8
Stage of work
Maintenance
OMMAS records the stage of progress as “Maintenance”.
Stage of Progress: Maintenance
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-III (CSV export), p. 8