Project record
Bittagondanahally - T - 01,N.S.ROAD
PMGSY-I · package KN2517 · Gubbi block · Completed
- Location
- Gubbi block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Bittagondanahally - T - 01,N.S.ROAD
OMMAS lists PMGSY-I work KN2517 as “Bittagondanahally - T - 01,N.S.ROAD”.
Road Name / Bridge Name: Bittagondanahally - T - 01,N.S.ROAD
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 4
Project / work ID
KN2517
OMMAS package number KN2517.
Package No.: KN2517
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 4
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 4
Contractor
C N SOMASHEKAR [04 Jul 2006], Guru and Co Tumkur
OMMAS lists the contractor for this work as “C N SOMASHEKAR [04 Jul 2006], Guru and Co Tumkur”.
Contractor Name: C N SOMASHEKAR [04 Jul 2006], Guru and Co Tumkur [21 May 2011]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 4
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹168.75 lakh
The sanction cost is recorded as 168.75 (₹ lakh).
Sanction Cost: 168.75
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 4
Maintenance cost due
₹10.73 lakh
The “5 Years Maintenance Cost Due” column shows 10.73 (₹ lakh).
5 Years Maintenance Cost Due: 10.73
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 4
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-11-2009
The completion date column reads “Financial: 10-05-2012/ Physical: 30-11-2009”; the physical completion date is 30-11-2009.
Completion Date: Financial: 10-05-2012/ Physical: 30-11-2009
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 4
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
8.640 km
Road length 8.640 km; 8.640 km recorded as completed.
Road Length (Kms): 8.640
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 4
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 4