Project record
Honnudike - Bommanahallicross via Honnadevi temple,Kurugunda,Kallipalya
PMGSY-I · package KN2521B · Tumkur block · Completed
- Location
- Tumkur block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Honnudike - Bommanahallicross via Honnadevi temple,Kurugunda,Kallipalya
OMMAS lists PMGSY-I work KN2521B as “Honnudike - Bommanahallicross via Honnadevi temple,Kurugunda,Kallipalya”.
Road Name / Bridge Name: Honnudike - Bommanahallicross via Honnadevi temple,Kurugunda,Kallipalya
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 25
Project / work ID
KN2521B
OMMAS package number KN2521B.
Package No.: KN2521B
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 25
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 25
Contractor
Shivananda
OMMAS lists the contractor for this work as “Shivananda”.
Contractor Name: Shivananda [04 May 2007]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 25
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹21.00 lakh
The sanction cost is recorded as 21.00 (₹ lakh).
Sanction Cost: 21.00
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 25
Maintenance cost due
₹1.56 lakh
The “5 Years Maintenance Cost Due” column shows 1.56 (₹ lakh).
5 Years Maintenance Cost Due: 1.56
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 25
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-11-2008
The completion date column reads “Financial: 30-04-2010/ Physical: 30-11-2008”; the physical completion date is 30-11-2008.
Completion Date: Financial: 30-04-2010/ Physical: 30-11-2008
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 25
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
1.290 km
Road length 1.290 km; 1.290 km recorded as completed.
Road Length (Kms): 1.290
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 25
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 25