Project record
K.T.Road - Anekere
PMGSY-I · package KN2521E · Turuvekere block · Completed
- Location
- Turuvekere block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
K.T.Road - Anekere
OMMAS lists PMGSY-I work KN2521E as “K.T.Road - Anekere”.
Road Name / Bridge Name: K.T.Road - Anekere
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 29
Project / work ID
KN2521E
OMMAS package number KN2521E.
Package No.: KN2521E
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 29
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 29
Contractor
G C MANJANNA
OMMAS lists the contractor for this work as “G C MANJANNA”.
Contractor Name: G C MANJANNA [11 Jun 2007]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 29
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹25.74 lakh
The sanction cost is recorded as 25.74 (₹ lakh).
Sanction Cost: 25.74
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 29
Maintenance cost due
₹1.81 lakh
The “5 Years Maintenance Cost Due” column shows 1.81 (₹ lakh).
5 Years Maintenance Cost Due: 1.81
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 29
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-03-2009
The completion date column reads “Financial: 05-06-2010/ Physical: 31-03-2009”; the physical completion date is 31-03-2009.
Completion Date: Financial: 05-06-2010/ Physical: 31-03-2009
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 29
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
1.460 km
Road length 1.460 km; 1.460 km recorded as completed.
Road Length (Kms): 1.460
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 29
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 29