Project record
Y T Road - Burudeghatta
PMGSY-I · package KN2522 · Tiptur block · Completed
- Location
- Tiptur block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Y T Road - Burudeghatta
OMMAS lists PMGSY-I work KN2522 as “Y T Road - Burudeghatta”.
Road Name / Bridge Name: Y T Road - Burudeghatta
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 22
Project / work ID
KN2522
OMMAS package number KN2522.
Package No.: KN2522
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 22
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 22
Contractor
PUTTASWAMY GOWDA MK
OMMAS lists the contractor for this work as “PUTTASWAMY GOWDA MK”.
Contractor Name: PUTTASWAMY GOWDA MK [07 Jul 2007]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 22
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹43.00 lakh
The sanction cost is recorded as 43.00 (₹ lakh).
Sanction Cost: 43.00
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 22
Maintenance cost due
₹2.92 lakh
The “5 Years Maintenance Cost Due” column shows 2.92 (₹ lakh).
5 Years Maintenance Cost Due: 2.92
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 22
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-05-2008
The completion date column reads “Financial: 13-08-2008/ Physical: 31-05-2008”; the physical completion date is 31-05-2008.
Completion Date: Financial: 13-08-2008/ Physical: 31-05-2008
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 22
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
2.360 km
Road length 2.360 km; 2.360 km recorded as completed.
Road Length (Kms): 2.360
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 22
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 22