Project record
Adalagere - T 02
PMGSY-I · package KN2526 · Gubbi block · Completed
- Location
- Gubbi block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Adalagere - T 02
OMMAS lists PMGSY-I work KN2526 as “Adalagere - T 02”.
Road Name / Bridge Name: Adalagere - T 02
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 5
Project / work ID
KN2526
OMMAS package number KN2526.
Package No.: KN2526
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 5
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 5
Contractor
Raayegowda [15 Sep 2008], C N SOMASHEKAR
OMMAS lists the contractor for this work as “Raayegowda [15 Sep 2008], C N SOMASHEKAR”.
Contractor Name: Raayegowda [15 Sep 2008], C N SOMASHEKAR [20 Jan 2007]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 5
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹91.80 lakh
The sanction cost is recorded as 91.80 (₹ lakh).
Sanction Cost: 91.80
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 5
Maintenance cost due
₹6.48 lakh
The “5 Years Maintenance Cost Due” column shows 6.48 (₹ lakh).
5 Years Maintenance Cost Due: 6.48
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 5
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-06-2009
The completion date column reads “Financial: 18-01-2010/ Physical: 30-06-2009”; the physical completion date is 30-06-2009.
Completion Date: Financial: 18-01-2010/ Physical: 30-06-2009
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 5
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
5.225 km
Road length 5.225 km; 5.225 km recorded as completed.
Road Length (Kms): 5.225
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 5
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 5