Project record
KUPPALU VIA BYRAPURA T03
PMGSY-I · package KN2529 · Tiptur block · Completed
- Location
- Tiptur block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
KUPPALU VIA BYRAPURA T03
OMMAS lists PMGSY-I work KN2529 as “KUPPALU VIA BYRAPURA T03”.
Road Name / Bridge Name: KUPPALU VIA BYRAPURA T03
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 22
Project / work ID
KN2529
OMMAS package number KN2529.
Package No.: KN2529
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 22
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 22
Contractor
Raayegowda
OMMAS lists the contractor for this work as “Raayegowda”.
Contractor Name: Raayegowda [26 Dec 2006]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 22
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹102.00 lakh
The sanction cost is recorded as 102.00 (₹ lakh).
Sanction Cost: 102.00
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 22
Maintenance cost due
₹7.46 lakh
The “5 Years Maintenance Cost Due” column shows 7.46 (₹ lakh).
5 Years Maintenance Cost Due: 7.46
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 22
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-03-2009
The completion date column reads “Financial: 25-08-2010/ Physical: 31-03-2009”; the physical completion date is 31-03-2009.
Completion Date: Financial: 25-08-2010/ Physical: 31-03-2009
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 22
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
6.010 km
Road length 6.010 km; 6.010 km recorded as completed.
Road Length (Kms): 6.010
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 22
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 22