Project record
Lingadahally Gate (T10) - K.G.Hatty
PMGSY-I · package KN2543 · Pavagada block · Completed
- Location
- Pavagada block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Lingadahally Gate (T10) - K.G.Hatty
OMMAS lists PMGSY-I work KN2543 as “Lingadahally Gate (T10) - K.G.Hatty”.
Road Name / Bridge Name: Lingadahally Gate (T10) - K.G.Hatty
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 17
Project / work ID
KN2543
OMMAS package number KN2543.
Package No.: KN2543
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 17
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 17
Contractor
A S R Constructions
OMMAS lists the contractor for this work as “A S R Constructions”.
Contractor Name: A S R Constructions [18 Jun 2007]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 17
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹238.25 lakh
The sanction cost is recorded as 238.25 (₹ lakh).
Sanction Cost: 238.25
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 17
Maintenance cost due
₹18.01 lakh
The “5 Years Maintenance Cost Due” column shows 18.01 (₹ lakh).
5 Years Maintenance Cost Due: 18.01
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 17
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-07-2008
The completion date column reads “Financial: 30-04-2010/ Physical: 31-07-2008”; the physical completion date is 31-07-2008.
Completion Date: Financial: 30-04-2010/ Physical: 31-07-2008
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 17
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
12.060 km
Road length 12.060 km; 12.060 km recorded as completed.
Road Length (Kms): 12.060
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 17
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 17