Project record
Benavara - T-08
PMGSY-I · package KN2546 · Kunigal block · Completed
- Location
- Kunigal block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Benavara - T-08
OMMAS lists PMGSY-I work KN2546 as “Benavara - T-08”.
Road Name / Bridge Name: Benavara - T-08
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 11
Project / work ID
KN2546
OMMAS package number KN2546.
Package No.: KN2546
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 11
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 11
Contractor
Nirman Engineers & Contractors
OMMAS lists the contractor for this work as “Nirman Engineers & Contractors”.
Contractor Name: Nirman Engineers & Contractors [18 Jun 2008]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 11
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹346.78 lakh
The sanction cost is recorded as 346.78 (₹ lakh).
Sanction Cost: 346.78
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 11
Maintenance cost due
₹22.35 lakh
The “5 Years Maintenance Cost Due” column shows 22.35 (₹ lakh).
5 Years Maintenance Cost Due: 22.35
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 11
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-12-2009
The completion date column reads “Financial: 14-10-2010/ Physical: 31-12-2009”; the physical completion date is 31-12-2009.
Completion Date: Financial: 14-10-2010/ Physical: 31-12-2009
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 11
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
12.330 km
Road length 12.330 km; 12.330 km recorded as completed.
Road Length (Kms): 12.330
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 11
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 11