Project record
Rajavanti - T.N.Kote
PMGSY-I · package KN2548 · Pavagada block · Completed
- Location
- Pavagada block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Rajavanti - T.N.Kote
OMMAS lists PMGSY-I work KN2548 as “Rajavanti - T.N.Kote”.
Road Name / Bridge Name: Rajavanti - T.N.Kote
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 17
Project / work ID
KN2548
OMMAS package number KN2548.
Package No.: KN2548
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 17
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 17
Contractor
JayaPrakash
OMMAS lists the contractor for this work as “JayaPrakash”.
Contractor Name: JayaPrakash [25 Jul 2008]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 17
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹465.36 lakh
The sanction cost is recorded as 465.36 (₹ lakh).
Sanction Cost: 465.36
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 17
Maintenance cost due
₹32.57 lakh
The “5 Years Maintenance Cost Due” column shows 32.57 (₹ lakh).
5 Years Maintenance Cost Due: 32.57
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 17
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-07-2009
The completion date column reads “Financial: 08-10-2010/ Physical: 31-07-2009”; the physical completion date is 31-07-2009.
Completion Date: Financial: 08-10-2010/ Physical: 31-07-2009
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 17
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
17.500 km
Road length 17.500 km; 17.500 km recorded as completed.
Road Length (Kms): 17.500
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 17
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 17