Project record
Gollarahatti - T-16
PMGSY-I · package KN2552 · Sira block · Completed
- Location
- Sira block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Gollarahatti - T-16
OMMAS lists PMGSY-I work KN2552 as “Gollarahatti - T-16”.
Road Name / Bridge Name: Gollarahatti - T-16
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 19
Project / work ID
KN2552
OMMAS package number KN2552.
Package No.: KN2552
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 19
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 19
Contractor
JEERIGE CONSTRUCTIONS [26 Apr 2010], C.R.Harish [03 Jun 2011], B.Shivakumaraswamy.
OMMAS lists the contractor for this work as “JEERIGE CONSTRUCTIONS [26 Apr 2010], C.R.Harish [03 Jun 2011], B.Shivakumaraswamy.”.
Contractor Name: JEERIGE CONSTRUCTIONS [26 Apr 2010], C.R.Harish [03 Jun 2011], B.Shivakumaraswamy. [23 Jun 2008]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 19
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹293.70 lakh
The sanction cost is recorded as 293.70 (₹ lakh).
Sanction Cost: 293.70
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 19
Maintenance cost due
₹37.46 lakh
The “5 Years Maintenance Cost Due” column shows 37.46 (₹ lakh).
5 Years Maintenance Cost Due: 37.46
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 19
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-03-2010
The completion date column reads “Financial: 12-03-2013/ Physical: 31-03-2010”; the physical completion date is 31-03-2010.
Completion Date: Financial: 12-03-2013/ Physical: 31-03-2010
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 19
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
11.130 km
Road length 11.130 km; 11.130 km recorded as completed.
Road Length (Kms): 11.130
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 19
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 19