Project record
T13 - Benakanakere
PMGSY-I · package KN2561 · Turuvekere block · Completed
- Location
- Turuvekere block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
T13 - Benakanakere
OMMAS lists PMGSY-I work KN2561 as “T13 - Benakanakere”.
Road Name / Bridge Name: T13 - Benakanakere
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 29
Project / work ID
KN2561
OMMAS package number KN2561.
Package No.: KN2561
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 29
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 29
Contractor
ASHOK
OMMAS lists the contractor for this work as “ASHOK”.
Contractor Name: ASHOK [09 Jan 2009]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 29
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹366.00 lakh
The sanction cost is recorded as 366.00 (₹ lakh).
Sanction Cost: 366.00
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 29
Maintenance cost due
₹25.63 lakh
The “5 Years Maintenance Cost Due” column shows 25.63 (₹ lakh).
5 Years Maintenance Cost Due: 25.63
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 29
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-01-2010
The completion date column reads “Financial: 21-10-2010/ Physical: 31-01-2010”; the physical completion date is 31-01-2010.
Completion Date: Financial: 21-10-2010/ Physical: 31-01-2010
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 29
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
13.330 km
Road length 13.330 km; 13.330 km recorded as completed.
Road Length (Kms): 13.330
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 29
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 29