Project record
HuchanaHalli - T-13
PMGSY-I · package KN2564 · C.N.Halli block · Completed
- Location
- C.N.Halli block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
HuchanaHalli - T-13
OMMAS lists PMGSY-I work KN2564 as “HuchanaHalli - T-13”.
Road Name / Bridge Name: HuchanaHalli - T-13
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 2
Project / work ID
KN2564
OMMAS package number KN2564.
Package No.: KN2564
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 2
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 2
Contractor
M G SHIVASHANKARA SWAMY
OMMAS lists the contractor for this work as “M G SHIVASHANKARA SWAMY”.
Contractor Name: M G SHIVASHANKARA SWAMY [01 Oct 2009]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 2
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹296.73 lakh
The sanction cost is recorded as 296.73 (₹ lakh).
Sanction Cost: 296.73
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 2
Maintenance cost due
₹22.19 lakh
The “5 Years Maintenance Cost Due” column shows 22.19 (₹ lakh).
5 Years Maintenance Cost Due: 22.19
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 2
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-04-2012
The completion date column reads “Financial: 18-06-2013/ Physical: 30-04-2012”; the physical completion date is 30-04-2012.
Completion Date: Financial: 18-06-2013/ Physical: 30-04-2012
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 2
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
12.240 km
Road length 12.240 km; 12.240 km recorded as completed.
Road Length (Kms): 12.240
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 2
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 2