Project record
Dasalakunte - T-08
PMGSY-I · package KN2569 · Koratagere block · Completed
- Location
- Koratagere block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Dasalakunte - T-08
OMMAS lists PMGSY-I work KN2569 as “Dasalakunte - T-08”.
Road Name / Bridge Name: Dasalakunte - T-08
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 9
Project / work ID
KN2569
OMMAS package number KN2569.
Package No.: KN2569
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 9
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 9
Contractor
A.D.Balaramaiah
OMMAS lists the contractor for this work as “A.D.Balaramaiah”.
Contractor Name: A.D.Balaramaiah [07 Oct 2009]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 9
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹111.09 lakh
The sanction cost is recorded as 111.09 (₹ lakh).
Sanction Cost: 111.09
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 9
Maintenance cost due
₹7.89 lakh
The “5 Years Maintenance Cost Due” column shows 7.89 (₹ lakh).
5 Years Maintenance Cost Due: 7.89
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 9
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-09-2011
The completion date column reads “Financial: 12-01-2012/ Physical: 30-09-2011”; the physical completion date is 30-09-2011.
Completion Date: Financial: 12-01-2012/ Physical: 30-09-2011
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 9
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
3.870 km
Road length 3.870 km; 3.870 km recorded as completed.
Road Length (Kms): 3.870
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 9
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 9