Project record
Kodihalli - T-08
PMGSY-I · package KN2573 · Kunigal block · Completed
- Location
- Kunigal block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Kodihalli - T-08
OMMAS lists PMGSY-I work KN2573 as “Kodihalli - T-08”.
Road Name / Bridge Name: Kodihalli - T-08
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 12
Project / work ID
KN2573
OMMAS package number KN2573.
Package No.: KN2573
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 12
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 12
Contractor
Nirman Engineers & Contractors
OMMAS lists the contractor for this work as “Nirman Engineers & Contractors”.
Contractor Name: Nirman Engineers & Contractors [24 Sep 2009]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 12
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹137.31 lakh
The sanction cost is recorded as 137.31 (₹ lakh).
Sanction Cost: 137.31
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 12
Maintenance cost due
₹8.92 lakh
The “5 Years Maintenance Cost Due” column shows 8.92 (₹ lakh).
5 Years Maintenance Cost Due: 8.92
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 12
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-12-2010
The completion date column reads “Financial: 06-08-2011/ Physical: 31-12-2010”; the physical completion date is 31-12-2010.
Completion Date: Financial: 06-08-2011/ Physical: 31-12-2010
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 12
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
4.750 km
Road length 4.750 km; 4.750 km recorded as completed.
Road Length (Kms): 4.750
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 12
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 12