Project record
PG Palya - T-01
PMGSY-I · package KN2574 · Kunigal block · Completed
- Location
- Kunigal block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
PG Palya - T-01
OMMAS lists PMGSY-I work KN2574 as “PG Palya - T-01”.
Road Name / Bridge Name: PG Palya - T-01
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 12
Project / work ID
KN2574
OMMAS package number KN2574.
Package No.: KN2574
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 12
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 12
Contractor
Nirman Engineers & Contractors
OMMAS lists the contractor for this work as “Nirman Engineers & Contractors”.
Contractor Name: Nirman Engineers & Contractors [24 Sep 2009]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 12
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹261.67 lakh
The sanction cost is recorded as 261.67 (₹ lakh).
Sanction Cost: 261.67
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 12
Maintenance cost due
₹19.02 lakh
The “5 Years Maintenance Cost Due” column shows 19.02 (₹ lakh).
5 Years Maintenance Cost Due: 19.02
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 12
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-03-2011
The completion date column reads “Financial: 06-08-2011/ Physical: 31-03-2011”; the physical completion date is 31-03-2011.
Completion Date: Financial: 06-08-2011/ Physical: 31-03-2011
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 12
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
9.300 km
Road length 9.300 km; 9.300 km recorded as completed.
Road Length (Kms): 9.300
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 12
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 12