Project record
Yaliyur - T-03
PMGSY-I · package KN2580 · Sira block · Completed
- Location
- Sira block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Yaliyur - T-03
OMMAS lists PMGSY-I work KN2580 as “Yaliyur - T-03”.
Road Name / Bridge Name: Yaliyur - T-03
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 20
Project / work ID
KN2580
OMMAS package number KN2580.
Package No.: KN2580
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 20
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 20
Contractor
B.A. Shyam
OMMAS lists the contractor for this work as “B.A. Shyam”.
Contractor Name: B.A. Shyam [07 Oct 2009]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 20
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹103.76 lakh
The sanction cost is recorded as 103.76 (₹ lakh).
Sanction Cost: 103.76
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 20
Maintenance cost due
₹7.77 lakh
The “5 Years Maintenance Cost Due” column shows 7.77 (₹ lakh).
5 Years Maintenance Cost Due: 7.77
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 20
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
30-06-2011
The completion date column reads “Financial: 24-05-2012/ Physical: 30-06-2011”; the physical completion date is 30-06-2011.
Completion Date: Financial: 24-05-2012/ Physical: 30-06-2011
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 20
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
3.810 km
Road length 3.810 km; 3.810 km recorded as completed.
Road Length (Kms): 3.810
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 20
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 20