Project record
Kothihalli - T-14
PMGSY-I · package KN2588 · Tumkur block · Completed
- Location
- Tumkur block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Kothihalli - T-14
OMMAS lists PMGSY-I work KN2588 as “Kothihalli - T-14”.
Road Name / Bridge Name: Kothihalli - T-14
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 27
Project / work ID
KN2588
OMMAS package number KN2588.
Package No.: KN2588
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 27
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 27
Contractor
T L Rajendran
OMMAS lists the contractor for this work as “T L Rajendran”.
Contractor Name: T L Rajendran [07 Oct 2009]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 27
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹134.20 lakh
The sanction cost is recorded as 134.20 (₹ lakh).
Sanction Cost: 134.20
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 27
Maintenance cost due
₹8.69 lakh
The “5 Years Maintenance Cost Due” column shows 8.69 (₹ lakh).
5 Years Maintenance Cost Due: 8.69
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 27
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-05-2011
The completion date column reads “Financial: 17-10-2011/ Physical: 31-05-2011”; the physical completion date is 31-05-2011.
Completion Date: Financial: 17-10-2011/ Physical: 31-05-2011
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 27
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
4.260 km
Road length 4.260 km; 4.260 km recorded as completed.
Road Length (Kms): 4.260
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 27
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 27