Rayashettihalli - L092

PMGSY-I · package KN2592 · Tiptur block · Completed

Location
Tiptur block, Tumakuru district
Alignment drawn
none published: found by name
Documents
2
Verified facts
10 of 10
10 verified in official records0 open questions

Who is responsible

The project, the agency that executes it, and the contractor named in the records.

Project

Rayashettihalli - L092

OMMAS lists PMGSY-I work KN2592 as “Rayashettihalli - L092”.

Road Name / Bridge Name: Rayashettihalli - L092

[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 23

VerifiedOfficial record

Project / work ID

KN2592

OMMAS package number KN2592.

VerifiedOfficial record

Responsible agency

DPIU Of Tumkur

The programme implementation unit is recorded as “DPIU Of Tumkur”.

Programme Implementation Unit: DPIU Of Tumkur

[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 23

VerifiedOfficial record

Contractor

PUTTASWAMY GOWDA MK

OMMAS lists the contractor for this work as “PUTTASWAMY GOWDA MK”.

Contractor Name: PUTTASWAMY GOWDA MK [11 Jul 2011]

[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 23

VerifiedOfficial record

Money

Amounts as stated in the records, with their units.

Sanctioned cost

₹109.35 lakh

The sanction cost is recorded as 109.35 (₹ lakh).

VerifiedOfficial record

Maintenance cost due

₹8.32 lakh

The “5 Years Maintenance Cost Due” column shows 8.32 (₹ lakh).

VerifiedOfficial record

Dates and obligations

When the work was awarded and completed, and how long the contractor must maintain it.

Completion date

31-12-2012

The completion date column reads “Financial: 01-03-2013/ Physical: 31-12-2012”; the physical completion date is 31-12-2012.

Completion Date: Financial: 01-03-2013/ Physical: 31-12-2012

[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 23

VerifiedOfficial record

Defect liability / maintenance period

5 years

The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.

…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…

[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40

VerifiedOfficial record

Scope and condition

What the work was meant to include, and what inspections and audits recorded.

Planned scope

3.760 km

Road length 3.760 km; 3.760 km recorded as completed.

VerifiedOfficial record

Stage of work

Completed

OMMAS records the stage of progress as “Completed”.

VerifiedOfficial record