Project record
Ganjalaghatta - L089
PMGSY-I · package KN2593 · Tiptur block · Completed
- Location
- Tiptur block, Tumakuru district
- Alignment drawn
- none published: found by name
- Documents
- 2
- Verified facts
- 10 of 10
Who is responsible
The project, the agency that executes it, and the contractor named in the records.
Project
Ganjalaghatta - L089
OMMAS lists PMGSY-I work KN2593 as “Ganjalaghatta - L089”.
Road Name / Bridge Name: Ganjalaghatta - L089
[1]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 23
Project / work ID
KN2593
OMMAS package number KN2593.
Package No.: KN2593
[2]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 23
Responsible agency
DPIU Of Tumkur
The programme implementation unit is recorded as “DPIU Of Tumkur”.
Programme Implementation Unit: DPIU Of Tumkur
[3]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 23
Contractor
PUTTASWAMY GOWDA MK
OMMAS lists the contractor for this work as “PUTTASWAMY GOWDA MK”.
Contractor Name: PUTTASWAMY GOWDA MK [11 Jul 2011]
[4]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 23
Money
Amounts as stated in the records, with their units.
Sanctioned cost
₹220.53 lakh
The sanction cost is recorded as 220.53 (₹ lakh).
Sanction Cost: 220.53
[5]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 23
Maintenance cost due
₹16.66 lakh
The “5 Years Maintenance Cost Due” column shows 16.66 (₹ lakh).
5 Years Maintenance Cost Due: 16.66
[9]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 23
Dates and obligations
When the work was awarded and completed, and how long the contractor must maintain it.
Completion date
31-12-2012
The completion date column reads “Financial: 01-03-2013/ Physical: 31-12-2012”; the physical completion date is 31-12-2012.
Completion Date: Financial: 01-03-2013/ Physical: 31-12-2012
[10]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 23
Defect liability / maintenance period
5 years
The PMGSY Programme Guidelines (para 17.2) state that all PMGSY roads are covered by 5-year maintenance contracts entered into with the same contractor as the construction contract.
…PMGSY roads (including associated Main Rural Links / Through Routes of PMGSY link routes) will be covered by 5-year maintenance contracts, (see Para 8.6) to be entered into along with the construction contract, with the…
[11]Pradhan Mantri Gram Sadak Yojana — Programme Guidelines, p. 40
Scope and condition
What the work was meant to include, and what inspections and audits recorded.
Planned scope
6.960 km
Road length 6.960 km; 6.960 km recorded as completed.
Road Length (Kms): 6.960
[7]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 23
Stage of work
Completed
OMMAS records the stage of progress as “Completed”.
Stage of Progress: Completed
[8]SLR: Statewise List of Works — Karnataka, Tumakuru, PMGSY-I (CSV export), p. 23